01 The site
ECDC is an oil and gas drilling company. We protected both its petroleum sites and the company’s own premises.
02 The risk
Drilling sites and offices face different risks, so each needed its own mix of water, gas and detection.
03 What we built
3 systems, one contractor
SESCO supplied, installed and commissioned every system on this list.
-
Fire pump station
Ebbit fire pumps, 250 GPM
-
CO₂ total flooding
CO₂ total flooding system
-
Fire alarm system
Addressable and conventional fire alarm systems