01 The site
MBS, part of Sika, produces construction chemicals. The site stores and processes materials that call for a fast, reliable response to fire.
02 The risk
Chemical storage and production areas need a strong water supply, while the technical rooms need clean agents that leave no residue behind.
03 What we built
5 systems, one contractor
SESCO supplied, installed and commissioned every system on this list.
-
Fire pump station
Bristol UL-FM pump station, 1,250 GPM
-
Sprinkler system
Sprinkler network with zoned control valves
-
Fire hose cabinets
Fire hose cabinets
-
CO₂ total flooding
CO₂ total flooding system
-
Novec clean agent
Novec clean agent system