Skip to content
SESCO Safety Equipment Services

HomeProjectsMBS – Sika

  • Construction chemicals

MBS – Sika

A chemicals site with a 1,250 GPM pump station, zoned sprinklers and two gas systems.

Read the story
Sector
Construction chemicals
Location
Egypt
Systems installed
5
GPM Bristol UL-FM pump station
1,250

01 The site

MBS, part of Sika, produces construction chemicals. The site stores and processes materials that call for a fast, reliable response to fire.

MBS – Sika

02 The risk

Chemical storage and production areas need a strong water supply, while the technical rooms need clean agents that leave no residue behind.

03 What we built

5 systems, one contractor

SESCO supplied, installed and commissioned every system on this list.

  1. Fire pump station

    Bristol UL-FM pump station, 1,250 GPM

  2. Sprinkler system

    Sprinkler network with zoned control valves

  3. Fire hose cabinets

    Fire hose cabinets

  4. CO₂ total flooding

    CO₂ total flooding system

  5. Novec clean agent

    Novec clean agent system

04 On site

The work, as we left it

MBS – Sika is protected by SESCO

Have a site with similar risks? Our engineers will visit and design the right protection.