01 The site
Suez Canal Container Terminal handles container ships on one of the world’s busiest waterways.
02 The risk
At a terminal that never stops, fire systems have to stay ready around the clock, so existing systems need to be kept up to date and maintained.
03 What we built
2 systems, one contractor
SESCO supplied, installed and commissioned every system on this list.
-
Fire pump station
Pump station modification
-
Modification and maintenance
Fire alarm maintenance